在线视频观看亚洲I特级黄色片免费看I午夜99I五月婷综合I欧美一区二区免费在线观看I亚洲最大avI国产伦精品一区二区三区…Iav色综合网I伊人久久婷婷I欧美综合色在线图区

成功案例

success cases

當前位置:首頁成功案例鮑米勒驅(qū)動器維修放大器719故障修理服務

鮑米勒驅(qū)動器維修放大器719故障修理服務

發(fā)布時間:2024/3/9 18:18:56

鮑米勒伺服驅(qū)動器維修服務:719Timeout during motor identification電機識別超時。Error during identification of motor parameters. The maximum permitted phase voltage (= 80 V) was exceeded during the resistance measurement.識別電機參數(shù)時出錯。在電阻測量過程中,超過了每個允許相的最大電壓(=80V)。

 

Possible cause: 原因:

Incorrect motor nominal current setting in Parameter 107.09.

參數(shù)107.09中的電機標稱電流設置不正確。

 

Effect: Output voltage set to ZERO to protect the motor. An additional drive block occurs with standard error response.

效果:輸出電壓設置為零,以保護電機。附加的驅(qū)動器塊出現(xiàn)標準錯誤響應。

 

Resetting after error elimination: 錯誤消除后重置:

Error reset is possible. Timeout (45 seconds) with R measurement with motor parameter identification, such as due to error during current / voltage measurement or normalization or limit value.錯誤重置是可能的。電機參數(shù)識別的R測量超時(45秒),例如由于電流/電壓測量或標準化或限值過程中的錯誤。